Tuesday, September 23, 2014

New Factory Meeting on Site ATEC 22/09/14

Concerner
1.TCT >> Nop, Bee
2.Plus >> Tong, Kob, Etc..
3.ATEC >> K.Hang, K.Pui, Tor
4.Prism >> K.Phuchong, K.Bom, Etc..

Topics.
1. Gutter on the west side, we have to drop the beam down and then put the gutter on the beam.
2. For the waste water from cooloing tower / chiller, we will make the small tank underground and put the tube from tank to tank (Transfer side) pass the center of building, we will use the pump to send the water.
3. Water drained from wet tank and Air compresser, we will make the small tank underground and put the tube from there to the tank of cooling tower, we will use the pump to send the water.
4.For the size and the doors of Air compresser area/building.